May 16, 2026

1,000 SKUs, 30 Vendors, and a Team That Needed More Hands

procurementlogistics

When I joined Brightstar Corp.'s mobile accessories supply chain team, the team itself was stretched thin — light on people, light on the systems that should have been doing half the work manually. The business I stepped into was managing roughly 1,000 SKUs sourced from around 30 vendors scattered across the globe. That's not a large catalogue by retail standards, but accessories move fast and the supply behind them doesn't.

That mismatch is the whole problem, once you see it. A phone case or charger has a short shelf life — trends move, models change, and last quarter's bestseller can be dead stock within a season. But the lead time to actually source and ship these things from overseas vendors doesn't shrink to match. You're always planning for a version of demand that will have shifted by the time your order lands.

Working the two ends at once

I couldn't fix the lead times — that's a function of geography and manufacturing, not something you negotiate away. So the real lever was tightening everything else: sharper demand signals, tighter vendor performance management, and using Oracle and SAP properly instead of working around their gaps with spreadsheets.

The work also had to run in step with major product launch cycles — iPhone releases especially, where a spike in demand for cases and chargers is entirely predictable in timing but genuinely hard to size in volume. Getting supply positioned ahead of a launch, not scrambling after it, was the difference between meeting demand and explaining a stockout to a very demanding customer base.

What actually moved

Two numbers mattered most: aged inventory came down, and DIFOT — delivery in full, on time — went up. Neither happens from one clever decision. It's the accumulation of smaller ones: better vendor scorecards, earlier reordering on the SKUs with the longest lead times, and being honest early when a forecast was wrong instead of hoping it would sort itself out.

What I'd tell someone stepping into a similarly stretched team

Being under-resourced isn't an excuse to lower the bar — it's a forcing function to figure out which 20% of the work actually moves the numbers. In a catalogue of 1,000 SKUs, not all of them deserve equal attention. Find the ones with the longest lead times and the least demand certainty, and put your limited hours there first. Everything else can wait a week. Those can't.